All Materials

De-preservation and Reactivation of the UGV Sirko-S1 Remote-Controlled Platform

1. Preliminary Steps:

1) Safety:

Ensure the de-preservation area complies with safety requirements (ventilation, lighting, fire safety) and the operating instructions, specifically:
  • The ambient temperature must be between -6°C and +25°C.
  • Humidity levels should not exceed values that cause condensation on the equipment.
  • Airflow speed must not exceed 3 m/s.
2) Tools:

Prepare wire cutters and scissors for cutting tape and film.

3) Documentation:

Verify the availability of and familiarize yourself with the UGV Sirko-S1 operating manual, product certificate, and other accompanying documents.

4) Seal Inspection:

Carefully inspect the Military Representative and manufacturer seals. Document their condition (photo/video) before removal.

5) Personnel:

Ensure that personnel performing the de-preservation have completed theoretical and practical training on the UGV Sirko-S1 through the manufacturer’s training center or a certified training center licensed by the manufacturer.

2. Unpacking:

(no changes)

3. Battery Installation:

Refer to this link

Initial Inspection and Verification:

Refer to this link.

5. Documentation:

(no changes)

Still have questions?

Contact us and we will definitely help
Question about platform / module operation
Problem or malfunction
Question about operation / settings
Request for additional documentation (instructions, specifications, certificates)
Suggestion for knowledge base improvement
Other
Sirko-S1 base platform
«Miner» (mine discharge systems)
TROPIYA (demining)
SKIF robotic manipulator
Towing and remote disconnect module
Other
Routine (not urgent)
Important (needs to be resolved within 1-2 business days)
Urgent (operational issue, requires quick response)
Thank you!
your request has been sent
Get in Touch